In construction, change orders can be a builder’s worst nightmare. They derail timelines, increase costs, and frustrate both contractors and clients. While some adjustments are unavoidable, many can be prevented with smarter choices from the start. One such choice gaining ground among builders and homeowners alike is the use of helical piles for decks—a solution that significantly reduces the likelihood of unexpected changes during construction.
The Change Order Challenge
Change orders typically arise from unforeseen site conditions, design modifications, or problems with traditional foundation methods. These can include issues like unsuitable soil, unexpected excavation challenges, or weather-related delays. While they may seem like part of the process, each change order chips away at project efficiency and client satisfaction.
Enter helical piles for decks—a foundation solution that minimizes risk from the ground up.
Why Deck Projects Are Especially Vulnerable
Decks, by nature, are often built in challenging or uneven terrain—near slopes, wet ground, or hard-to-access backyard spaces. Traditional concrete footings demand excavation, curing time, and ideal weather conditions. Any shift in these factors can delay construction and require expensive workarounds.
On the other hand, helical piles for decks bypass many of these vulnerabilities. Since they’re screwed into the ground with minimal disruption, they eliminate the guesswork that often leads to change orders.
Pre-Construction Testing Reduces Surprises
One of the main reasons helical piles for decks reduce change orders is because they allow for load testing and soil assessment before final installation. That means engineers and contractors can know in advance whether the ground conditions will support the design—no surprises halfway through.
Compare this to traditional methods, where issues with soil bearing capacity might only become apparent after concrete forms have been poured, dried, and failed. Helical piles offer a proactive, not reactive, approach.
Faster Installation Means Fewer Delays
Concrete-based foundations rely on multiple variables falling into place: dry weather, proper curing time, and accurate excavation. If any of these go sideways, you’re likely to see a change order.
Helical piles for decks are installed using small machinery and can be completed in a matter of hours—not days. They’re not weather-dependent and require no drying time. That speed minimizes the risk of falling behind schedule, and staying on schedule is one of the most effective ways to avoid change orders.
Built-In Adjustability Reduces Scope Changes
Another major advantage of helical piles for decks is their adaptability. Because they can be adjusted for height and angle during installation, they allow for on-the-fly corrections without altering the entire deck plan. This flexibility is especially helpful when dealing with sloped yards or complex designs.
Whereas concrete footings require perfect placement or else major revisions, helical piles give contractors the wiggle room needed to stay on track without initiating a formal change order process.
Long-Term Predictability and Cost Control
Change orders aren’t always about the build itself. Sometimes they’re triggered later on, when a deck shifts or sags due to improper foundation support. Helical piles, once installed, provide consistent long-term stability because they anchor deep into load-bearing soil layers. This translates into fewer warranty callbacks, repair orders, or client complaints down the line.
For homeowners, this stability equals peace of mind. For contractors, it means fewer unplanned costs—and a stronger reputation.
So while no construction project is completely immune to changes, using helical piles for decks gives your team a major advantage in keeping the process smooth, predictable, and professionally executed.
For more information about Drilling Service Okanagan Valley and Industrial Drilling British Columbia Please visit: ATLAS PILING.
Related Reads
- How a Local Non Profit Helps Hungry College Students in Philadelphia
- Highest Paying Trades in the US & Canada (2025)
- Trusted Driving Instructors in West Bromwich – Learn with the Best Automatic Driving Instructors
- Protecting and Extending the Life of Your 12V Lithium Battery
- Top Reasons to Buy Bed Online: Better Choices, Better Savings